Site

Did you mean
information rate

Search results

  1. Nutrient Management Plan (NRCS 590)

    https://agbmps.osu.edu/bmp/nutrient-management-plan-nrcs-590

    soil-stable and lost at low concentrations and at total pounds-per-acre rates in water flows. Unfortunately, ... important to account for all sources and timings of nitrogen applications to ensure that excess rates are ... not applied. Nitrogen needs to be managed to reduce the rate to the actual need of the crop. This ...

  2. Transitioning of Herds to Automatic Milking Systems

    https://dairy.osu.edu/newsletter/buckeye-dairy-news/volume-20-issue-5/transitioning-herds-automatic-milking-systems

    having installed the GEA system.  Although the adoption rate in Ohio is growing, it is certainly less ...

  3. Advanced Biobased Systems Workshop: Pipeline to Commercialization

    https://fabe.osu.edu/events/advanced-biobased-systems-workshop-pipeline-commercialization

    Sponsored by the Ohio Soybean Council Register by August 20th for early-bird and student rates. Click here ...

  4. Manure Spill Prevention

    https://dairy.osu.edu/newsletter/buckeye-dairy-news/volume-20-issue-5/manure-spill-prevention

    adequate rest, up-to-date manure management plans that guide application rates, weather monitoring, and ...

  5. Using Virtual Reality to Promote Farm Safety

    https://fabe.osu.edu/news/using-virtual-reality-promote-farm-safety

    “realism” of the training program. “Heart rate monitors and cab cameras helped the virtual reality team ...

  6. Restored Wetlands (NRCS 657)

    https://agbmps.osu.edu/bmp/restored-wetlands-nrcs-657

    a high Corn Suitability Rating (CSR 80) treating about 100 acres of drainage, would cost just over ...

  7. Wood Chip Bioreactor (NRCS 605)

    https://agbmps.osu.edu/bmp/wood-chip-bioreactor-nrcs-605

    removal rates average 4.7 gallons of nitrogen removed per bioreactor (Addy et al., 2016). The design life ...

  8. Water Control Structure (NRCS 587)

    https://agbmps.osu.edu/bmp/water-control-structure-nrcs-587

    or rate of flow, or maintains a desired water surface elevation. Water control structures are in open ...

  9. Blind Inlet (NRCS 620)

    https://agbmps.osu.edu/bmp/blind-inlet-nrcs-620

    lifetime did not appreciably decrease flow rates or cause maintenance issues. Monitoring throughout 12 ...

  10. Cover Crops (NRCS 340)

    https://agbmps.osu.edu/bmp/cover-crops-nrcs-340

    herbicides. Follow the herbicide label for rate and timing. Purdue Extension’s Successful Cover Crop ... benefits of cover crops. The tool uses cost inputs such as seed type and rate, planting, termination, and ...

Pages