Site

Did you mean
information rate

Search results

  1. Long-term P & K and N-rate Trials

    https://soilfertility.osu.edu/our-research/long-term-p-k-and-n-rate-trials

    fertilization rates (control (0), 1x, 2x, and 3x) are applied routinely to the same trial plots. The plots are ...

  2. Constructed Wetlands (NRCS 656)

    https://agbmps.osu.edu/bmp/constructed-wetlands-nrcs-656

    Suitability Rating (CSR 80) treating about 100 acres of drainage, would cost just over $10,000 for design and ... the seed to ensure that planted materials have an acceptable rate of survival, and site preparation ...

  3. Northwest Ohio Precision Planter Day to be Held by OSU Extension

    https://fulton.osu.edu/events/northwest-ohio-precision-planter-day-be-held-osu-extension

    variable rate seeding, precision placement with your planter (John Fulton, OSUE), variable rate seeding and ...

  4. Riparian Forest Buffers (NRCS 391)

    https://agbmps.osu.edu/bmp/riparian-forest-buffers-nrcs-391

    removal varies with seasonal hydrology. The removal rate for a forest buffer is 93 percent during a low ... trees tend to survive at a higher rate. Land taken out of production should be considered in the cost ...

  5. Nutrient Management Plan (NRCS 590)

    https://agbmps.osu.edu/bmp/nutrient-management-plan-nrcs-590

    soil-stable and lost at low concentrations and at total pounds-per-acre rates in water flows. Unfortunately, ... important to account for all sources and timings of nitrogen applications to ensure that excess rates are ... not applied. Nitrogen needs to be managed to reduce the rate to the actual need of the crop. This ...

  6. Wood Chip Bioreactor (NRCS 605)

    https://agbmps.osu.edu/bmp/wood-chip-bioreactor-nrcs-605

    removal rates average 4.7 gallons of nitrogen removed per bioreactor (Addy et al., 2016). The design life ...

  7. Water Control Structure (NRCS 587)

    https://agbmps.osu.edu/bmp/water-control-structure-nrcs-587

    or rate of flow, or maintains a desired water surface elevation. Water control structures are in open ...

  8. Restored Wetlands (NRCS 657)

    https://agbmps.osu.edu/bmp/restored-wetlands-nrcs-657

    a high Corn Suitability Rating (CSR 80) treating about 100 acres of drainage, would cost just over ...

  9. Christine Balk

    https://plantpath.osu.edu/our-people/christine-balk

    and Technology Conference, Ada, Ohio, March 5, 2014- Effective Rates of Metalaxyl and Assessment of ...

  10. Blind Inlet (NRCS 620)

    https://agbmps.osu.edu/bmp/blind-inlet-nrcs-620

    lifetime did not appreciably decrease flow rates or cause maintenance issues. Monitoring throughout 12 ...

Pages